Getting to proposed instead of Existing |
I have been starting projects and getting the existing grades, etc. However, when I load a second drawing to start working on the proposed elevations, it does not let me actually do proposed work. Am I missing a setting or something? I've tried re-starting the program.
Hi Arian,
The proposed take-off needs to be completed in the phases/tabs subsequent to the 'Existing' phase. The phase tabs are located at the bottom of the screen; when you start a new project you automatically have the Existing and Proposed 1 phases. To add more phases, click the plus. You can find more information about the interface on page 10 of the PDF user manual. A copy can be found here: https://www.kublasoftware.com/documentat...ition=2024 -Kate
<p><br></p>
|
Users browsing this thread: |
1 Guest(s) |