Getting to proposed instead of Existing

#1

I have been starting projects and getting the existing grades, etc.  However, when I load a second drawing to start working on the proposed elevations, it does not let me actually do proposed work.  Am I missing a setting or something?  I've tried re-starting the program.
Reply

#2

Hi Arian,

The proposed take-off needs to be completed in the phases/tabs subsequent to the 'Existing' phase. The phase tabs are located at the bottom of the screen; when you start a new project you automatically have the Existing and Proposed 1 phases. To add more phases, click the plus.

You can find more information about the interface on page 10 of the PDF user manual. A copy can be found here: https://www.kublasoftware.com/documentat...ition=2024

-Kate