Sewer Spoil Calculation |
(09-01-2023, 08:34 PM)Aryabhat Wrote: Hi Team, Hi Aryabhat Welcome to the forums. I think the process for calculating sewer spoils would be the same as calculating stockpiles. Basically you have to define your stockpile as the existing surface. Then in the proposed you use a platform element to draw an area around the stockpile giving it the level of the ground when the stockpile is completely removed. Set the platform mode to 'cut only' to prevent it from filling in any small low spots. The cut in the proposed phase will then be the volume of the stockpile. We have written an article about this process here : How to calculate stockpile volumes with free software If you have uneven ground then it gets a bit more complicated and you would have to use the professional version not Kubla Cubed Lite. With uneven ground, in the proposed instead of using a platform you would use a feature surface. Use a ground outline to tie to the base of the stockpile. This will approximate the topography of the ground underneath the stockpoil\spoil. If you have a survey of the ground you can improve accuracy by loading the points into the feature surface as well. Good luck and let us know if you get stuck. |
Messages In This Thread |
Sewer Spoil Calculation - by Aryabhat - 09-01-2023, 08:34 PM
RE: Sewer Spoil Calculation - by Ted Woods - 09-05-2023, 08:54 AM
RE: Sewer Spoil Calculation - by DavidL - 09-06-2023, 04:48 AM
|
Users browsing this thread: |
1 Guest(s) |