(07-07-2025, 05:51 PM)Steve Keen Wrote: Hi,
I'm struggling to add Lidar information to my original take off from PDF.
The issue I have is that the original PDF's worked from were not aligned to Eastings and Northings and were automatically zero located.
I have input all of the existing and proposed levels to gve me cut and fill for all of the components I would need.
However, a Lidar survey has been taken of the site that gives a post demolition survey.
The idea would be to introduce this after the existing topo and before the proposed levels.
The issue I am finding is that when trying to add this into my scheme it locates to it's Eastings and Northings and I can't find a way to merge and integrate this information.
The Lidar post demo survey would efectively replace the existing topo and adjust the proposed cut and flll accordingly.
Suggestions on a post card, please....
Steve
Hi Steve
Welcome to the forums. We do have an in-house process for transforming a project. In this case a Move sounds like all is required to GeoLocate your project. If you have a point on the plan that you know the easting and northings of, if you send it to us we can try to move the project. You can also offset the feature surface in X,Y potentially but I think the other method is better.
-Ted