Welcome Guest, Not a member yet? Create Account  


Program Calculation

#1

Hi Ted,

I am recently taking off earthwork/pavement/rock pitching qty for a road project of 1.9km length and using Kubla Cubed to form up the model from pdf drawings provided. I used a total of 23 construction stages to simulate the construction process and the model file is about 9.8MB in size. Whenever I call up the Kubla program to start the project file it would take about 30 minutes or so to load the project. Is it possible for the program to have a faster loading time instead of re-calculating every construction stages up to the last stage during start up. Can the program jump straight into last construction stage (Stage#23) whenever I start up the program by bypassing all recalculation from existing stage onwards ? This will definitely speed up the project file loading time.


Please advise.

Thanks and regards,
Bernard
Reply


Messages In This Thread
Program Calculation - by Bernard - 03-05-2018, 11:32 PM



Users browsing this thread:
3 Guest(s)