(05-09-2021, 05:35 PM)sbible Wrote: Oh man, that is how it works... that is actually a really simple algorithm.


In Kubla Cubed 2021 (due at the end of June 2021), this setup will be improved.  The strip will have a setting called : 

Depths From 
 

Which will have three options 'Ground', 'PreviousElement' and 'Specified Element'.  The default will be ground so strips will in fact overwrite each other like the absolute elements which is more useful in a lot of scenarios. 'Previous Element' (the behaviour in Kubla Cubed 2015, 2016, 2017, 2019) is there for backward compatibility reasons and some custom scenarios that it may be useful for.

'Specified Element' will be the new recommended method for doing the 'strip method' subgrade adjustment.  First you will do your FFL levels and then set the 'Depths From' to be from that element so it will allow the strips to replace each other where they intersect and act and still act on the lower down element.  A big improvement I think  in both workflows.

The Strip element will be renamed to Reduce as it makes more sense considering it is used for a lot of scenarios that are not topsoil stripping. The subgrade adjustment 'Strip Method' will be now called 'Reduce Method'.
Reply


Messages In This Thread
Site strip - by Marcus - 09-05-2018, 01:49 PM
RE: Site strip - by Leo - 09-05-2018, 04:45 PM
RE: Site strip - by Marcus - 09-05-2018, 07:30 PM
RE: Site strip - by Ted Woods - 09-06-2018, 01:42 PM
RE: Site strip - by sbible - 05-09-2021, 05:35 PM
RE: Site strip - by Ted Woods - 05-10-2021, 09:36 AM
RE: Site strip - by evawillms - 10-10-2023, 03:32 AM



Users browsing this thread:
1 Guest(s)